I would agree with what has been posted , unfortunately I have lost count the amount of jobs I have seen specified to comply to BS 5839 2002 . As well we all know that doesn't exist . I find it incredible that on a drawing released in many cases the system actual design (lets say L2) for example never appears , on the drawing.
Any diligent installer , commissioning engineer , has by default a duty of care to notify where he / she knowingly encounters a system that is wrong , there by doing someones work who has got paid to do it already. The safety net is obviously 3rd party verification .
Therefore in my view , before any installation work starts , look at your specification and quantify what the design is and don't entertain BS 5839 2002 as it will no doubt only get worse from there.