Hi I know this has been covered in depth on other posts but I would just like your opinion please.
A care home that I provide training for recently had a visit from the local authority fire inspector.
He was very happy with the fire safety in the care home all but a minor point on the recording of the testing of the of manual call points (MCP)
Now I can only write what they have told me, the care home has 15 MCP but the inspector has informed them that they need to test 4 MCP a week that would mean that they would all be tested in calendar month.
I have looked through BS 5839-1:2013 Section 6: Maintenance, 44 Routine testing sub paragraph (D) test one call point per week etc. etc.
Am I missing something here is anyone aware of another doc he might be quoting from or do you think this might be a breakdown in communication and they have misunderstood him?
Thanks