FRACS Technical Day 2011 MK Dons Stadium Milton Keynes
13th September 2011 (9 am to 4 pm)
Heres the final content for the day, looks very worthwhile. further info and bookings here:
http://www.warringtoncertification.com/fracs.html 9 am to 9 30 am Delegate registration Tea and Coffee
9 30 am to 9 35 am Welcome and Introduction; Simon Ince
Manager of personnel certification schemes, Warrington Certification Ltd
9 35 am to 9 50 am Chairman’s Address: Chris Hughes
Manager of Warrington Certification Ltd
‘Fire Safety in the UK, a certification body perspective’
9 50 am to 10 20 am Andrew Walker:
Prosecutions and Enforcement Policy Manager
Buckinghamshire Fire and Rescue Service
‘The new regulators guidance document; implications for enforcement of the Fire Safety Order’.
10.20 am to 10 50 am Jacob Rickett; Solicitor, Browne Jacobson LLP
‘The first successful prosecution of a fire risk assessor using article 5(3); legal implications for the fire risk profession’
10 50 am to 11 15 am Ian Woodhouse:Certification Process Manager
Warrington Certification Limited
‘Water mist systems’, test evidence and suitability for application; third party approval developments.
11 15 am to 11 30 am Break Tea and Coffee
11 30 am to 12 05 pm Niall Rowan Technical Officer
Association for Specialist Fire Protection
‘Structural fire protection and compartment wall penetrations’ practical guidance on inspection.
12 05 pm to 12 35 pm Paud Moriarty Local Authority Building Control, Birmingham
‘Building control and fire safety systems’;
Regulation 38 information.
12 35 pm to 1 15 pm Lunch
1 15 pm to 1 45 pm Ben Bradford
Director BB7 Fire Safety Engineering
PAS 7 – Strategic Fire Risk Management
‘Guidance and a recommended methodology for assessment and audit of organisational Fire Risk Management systems, systems requirements and the implementation of strategy’.
1 45 pm to 2 25 pm David Ware
Managing Director Fire Risk Consultancy Ltd
‘Online training – The Way Forward’; advanced CPD training for fire risk assessors and practical solutions to cut backs in staff training budgets’
2. 25 pm to 2 40 pm Break Tea and Coffee
2 40 pm to 3 20 pm John Pagan General Manager, Fire Engineering (Europe)
Exova Warringtonfire
‘Smoke extraction systems’; code compliance or engineered solutions, practical issues for assessors to consider.
3 20 pm to 3 50 pm Phil Martin Technical Manager Fire Industry Association,
‘Fire detection and alarm categories and specification’
3 50 pm to 4 pm Summary and Close; Chris Hughes