Operationally, I've attended dozens of car fires in MCPs - Send 2BA to the floor of origin hawl a HRJ aloft, delayed 30 minutes. Damage to car first ignited, perhaps slight damage to the cars either side. Why was this different?
All my fires in 60's and 70's built car parks, 4 open sides, well ventilated fire, probably could have got away with no BA.
Even car park design has changed, as an IO I got involved in a design for a car park enclosed on 3 sides, the AI said I only have to prove that my design is as safe as an ADB compliant car park. Yes I said. Well he produced a CFD model that showed an ADB compliant car park was smoke logged in 2.5 minutes and his in about 2 mins 25 secs. Where do you then go. Technology (CFD) says yes, my experience says hold on a minute, that can't be right.
Perhaps I'm old fashioned.